The construction of the sunken or split level room commences at the foundation stage. When the foundation walls are being erected, the level of the room will be stopped lower by two courses. The back filling and compaction is then done. After this stage, the hardcore base is then laid and compacted to the required levels. It is important that the internal wall finishing in this area be considered. This is because part this is in the foundation walls.
After hardcore is compacted, blinding is poured and compacted. A damp proof membrane is spread on the blinding after treating for termite and pests. A mesh fabric reinforcement is laid. Form work of the concrete thickness fixed. The concreting commences on the lowered floor level. After the floor is cast, the two courses that are exposed into the room are then built on top. Steps into this area are done during casting of the floor concrete.
The two courses of the sunken lounge should be treated for water proofing. This is because they are located in the foundation. The upper floor level then commences after this walls. The concreting operation is then repeated to complete the other areas of the house. Once the concrete floors are cured, walling commences for the whole house. Finishes on the two course walls are similar to what is chosen in the lounge after the work is completed.
Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS
Possibly Related Posts:






More Options ...
Categories
Tag Cloud
Blog RSS
Comments RSS



Void « Default
Life
Earth
Wind
Water
Fire
Light 